Case Study


Project Profile: Ohio Willow Wood, Mount Sterling, Ohio, 30 GPM Arsenic, Iron & Manganese System

Details

Click Here To Download:
Project Profile: Ohio Willow Wood, Mount Sterling, Ohio, 30 GPM Arsenic, Iron & Manganese System

By Adedge Technologies Inc.

In the winter of 2006 AdEdge Technologies, Inc. was pre-selected to as the treatment vendor to provide a system for arsenic, iron and manganese removal at the Ohio Willow Wood Facility in Mount Sterling, Ohio. To satisfy OEPA requirements, a pilot was installed to verify the effectiveness of the AD26 oxidation / filtration technology to reduce the target contaminants to below their respective MCLs. The pilot results concluded the success of the removal of the target contaminants and the project proceeded to design and implementation with the site's engineer, Burgess and Niple. Approval was received by OEPA and a full scale system was installed at the Ohio Willow Wood Co. facility in March of 2008.

Click Here To Download:
Project Profile: Ohio Willow Wood, Mount Sterling, Ohio, 30 GPM Arsenic, Iron & Manganese System

AdEdge Technologies Inc.

More From AdEdge Technologies Inc.

Please wait... busy