Case Study
Florida Power & Light Case Study
Source: Degremont Technologies
Florida Power & Light's (FP&L) new 2,400 MW combined cycle gas turbine plant, West County Energy Center, would require 14,000 gpm of softened water. Unfortunately, water supplies in the area were limited and they would be required to instantaneously switch to brackish well water from the Florida Aquifer when surface water was not available.
Register Today. It's Fast And Free.
The content you requested is only available to registered users of Water Online. By registering now, you'll get exclusive access to this piece of content and thousands of addtional articles and product reviews across our entire network of sites.