Case Study
Project Profile: Arsenic Treatment System - Red Mesa Unified School, Navajo Nation
Source: AdEdge Technologies Inc.
Click Here To Download:
Project Profile: Uranium Treatment System - Middletown Springs Elementary School, Vermont
By Adedge Technologies
In October 2005, AdEdge Technologies provided a proposal for the Red Mesa Unified School in Red Mesa, Arizona. AdEdge Technologies proposed a 75 gpm skid mounted system for the school that serves over 1000 students to reduce naturally occurring arsenic to meet the EPA maximum contaminant level (MCL) of 10 parts per billion (ppb). Historically, arsenic levels reported in the well serving the school averaged 33 ppb with a pH of 9.5.
Click Here To Download:Project Profile: Uranium Treatment System - Middletown Springs Elementary School, Vermont



